Update from Nancy Lockett 7/20/2016
We are continuing to work on the pre-design report for the City of Napavine Kirkland Road Flooding Study. We are on track to have a draft report this summer.
We are continuing to work on the pre-design report for the City of Napavine Kirkland Road Flooding Study.
We are on track to have a draft report this summer.