Napavine - Kirkland Road Flooding Project

  << Back

Update from Steve Ashley     1/13/2017

Update from Steve Ashley:

"At this time (January 11, 2017) Napavine has in its possession the final draft of the Kirkland Road Storm Water Study Report (see here).  The study gives Napavine a scope of activities and an estimate of costs to perform those activities. Activities include reshaping current ditch lines, upsizing current culverts, and placement of some new culverts in several locations.

Napavine's next step in this project related to the original scope of work within the Grant guidelines will be to work with WSDOT for any permits within the WSDOT right of way and to file for any environmental or archaeological issues that are within the scope of work to take place in the next 30 days."