Date Permit Status Description Link
  New information   Refer to Whatcom County website: http://www.co.whatcom.wa.us/pds/plan/current/gpt-ssa/index.jsp  
4/16/2012 Notice of Application Issued Whatcom County has issued a Formal Notice of Application pursuant to WCC 2.33. After the 30 day notice period the County, the United States Army Corps of Engineers and the Washington State Department of Ecology will issue a joint SEPA/NEPA Determination and scoping notices. Notice of Application
4/02/2012 Determination of Completeness Issued Whatcom County has issued a determination of completeness regarding PIT's 3/19/2012 submittals for a Major Project Permit and Shoreline Substantial Development Permit Determination of Completeness
12/21/2011 Permit Extension (Whatcom County) Granted PIT permit extension  request regarding Major Project Permit (MDP 2011-00001) and Shoreline Substantial Development Permit (SHR 2011-00009). Permit Extension
11/04/2011 Ecology Construction Stormwater General Permit (Ecology) Issued Ecology NPDES construction storm water general permit covering PIT’s geotechnical investigation activities. WAR125379
10/28/2011 HPA (WDFW) Re-Issued Reissued permit to conduct Acoustic Doppler Study 1222833-3
10/12/2011 Land Disturbance Permit (Whatcom County) Issued Permission for approximately 9.1 acres of clearing associated with geotechnical investigations. LDP 2011-00054
6/30/2011 Aquatic Lands Right of Entry Permit (WDNR) Issued Permission for sediment sampling analysis on DNR aquatic reserve lands. Right of Entry No. 23-087429
6/28/2011 USACE Issued Coverage under Nationwide Permit #6, sediment sampling NWS-2011-561
5/31/2011 HPA (WDFW) Issued Placement of an ADCP - modification of earlier HPA for surficial sediment sampling plan 122833-2
4/07/2011 Right of Entry Issued Right of entry to conduct Acoustic Doppler Study ROE No. 23-086821
03/01/2011 Aquatic Lease Application (WDNR) Pending Application for Authorization to Use State-owned Aquatic Lands (5/5/1992) DNR 20-013265
02/09/2011 USACE Issued Install research instrumentation in the Strait of Georgia NWS-2011-98
02/07/2011 HPA (WDFW) Issued Placement of an acoustic Doppler Current Profiler (ADCP) on the bottom near the location of the proposed Gateway Pacific Terminal to collect data on wave, current, and water depth for approximately 6 months 122833-1
02/03/2011 HPA (WDFW) Issued Collect geotechnical samples of the sea floor at Cherry Point 115191-2
01/19/2011 HPA (WDFW) Issued Pacific Terminal - Stream gauge installation 122656-1
Regulatory Actions
Date Action Status Description Link
  New Information   Refer to Whatcom County website: http://www.co.whatcom.wa.us/pds/plan/current/gpt-ssa/index.jsp  
11/20/2012 Wetlands Jurisdicational Determination (Parcel   14) Issued  

Jurisdictional Determination

GPT   Wetland Areas

9/24/2012 Determination of Significance (DS, SEPA) Issued Whatcom County issued the DS and request for comments on scope for EIS. DS
9/21/2012 Notice of Intent (NOI, NEPA) Issued The US Army Corps of Engineers published the NOI to prepare a joint EIS in the Federal Register. NOI
7/19/2012 Ecology Application Status Issued E-mail on Status of JARPA and 401 Certification Application E-mail
5/17/2012 Ecology Application Status Issued Letter on Status of 401 Certification Application Letter
3/12/2012, 3/16/2012 Inspection Report Issued Ecology water quality inspection conducted 3/12/2012 and 3/16/2012. Report
2/29/2012 Inspection Report Issued Ecology water quality inspection conducted 2/29/2012. Report
10/17/2011 MOU NEPA/SEPA EIS Issued MOU regarding Corps, Ecology and Whatcom County co-lead of NEPA/SEPA EIS. MOU
09/26/2011 DAHP Comment   Letter to County Issued Request withdrawal of MDNS and review of final cultural resources report, Permit from   DAHP may be required. Letter
09/26/2011 Ecology Comment Letter to County Issued Mitigated Determination of Nonsignificance (MDNS) Comments to Whatcom County Letter
09/23/2011 Ecology Violation Letter Issued Clearing of wetlands for geotechnical investigation - Corps Ref No. 200800260. Letter
09/23/2011 Whatcom   County Approval of SSA Marine Extension Request Issued Major Project Permit (MOP 2011-00001) and Shoreline Substantial Development Permit (SHR2011-00009) Extension Request. Approval
09/12/2011 Whatcom County MDNS Issued SEPA Mitigated Determination of Nonsignificance (MDNS) MDNS
08/19/2011 Whatcom County Approval Issued Temporary Erosion and Sediment Control (TESC) Plan Approval with Correspondence E-mail
8/19/2011 Whatcom County Prosecuting Attorney memo Issued Prosecuting Attorney issues memo regarding moratorium applicability Memo
08/17/2011 Whatcom County reissuance of NOV Issued Notice of Violation Notice
08/17/2011 Whatcom County Notice of Recission Issued Notice of Recission Notice
08/12/2011 WDNR Notice to Comply Issued Notice to Comply under State Forest Practices requirements Notice
08/04/2011 Ecology Warning Letter Issued Warning letter - Construction Stormwater Impacts Letter
08/03/2011 Whatcom County Notice of Violation Issued Memo from Whatcom County PDS to County Executive Memo
08/03/2011 Whatcom County Notice of Violation Issued Notice of Violation – Critical Areas Ordinance Notice
08/03/2011 Whatcom County Notice of Violation Issued Notice of Violation – Clearing Regulation Notice
07/15/2011 Ecology News Release Issued Decision by Ecology to Share Co-Lead Status with Whatcom County. News Release
07/15/2011 Ecology Letter to Whatcom County Issued Agreement from Ecolgy to Share Co-Lead Status with Whatcom County. Letter
07/15/2011 Whatcom County Letter to Ecology Issued Request that Ecology Share Co-Lead SEPA Status with Whatcom County. Letter
06/28/2011 Ecology 401 Certification Response Letter NA Letter on Status of 401 Certification Review Letter
06/23/2011 Whatcom County (WCPDS) Determination regarding   Gateway Pacific Terminal project. Issued Determination of incompleteness and requirement to obtain a new Shoreline Substantial Development Permit Determination
06/23/2011 WDFW Incomplete Application Letter NA Letter of Incomplete Application Letter
06/13/2011 USACE Determination of need for NEPA EIS Issued Letter and Memorandum laying out reasoning for USACE determination that an EIS under the National Environmental Policy Act will be required for the GPT Project.

Letter and Memorandum

USACE News Release