zoom+R
Today is
[Portal ID #1790]

Adams County Shoreline Master Program

  << Back

Draft documents available for review     2/22/2023

The SMP redlined document as well as the completed Ecology Periodic Review Checklist (contains the minimum scope of review requirements of WAC 173-26-090(2)(d)(ii). These documents can be found in the "Library" page under the category "Draft SMP."

<< Back