From Mark Steepy (KPFF):- KPFF is on target for a 60% design on or before Oct. 31st.
- Tide gates for the 7 culverts in the project area have been selected. 2 will be self-regulating tide gates to allow for tidal flushing and 5 will be one-way flexible rubber tide gates.
- Geotechnical borings to support the wall design are complete.
- The initial wall design has been revised to reduce wetland impacts to less than 0.05 acres which will speed up the permitting process.
|