Update from David Fleckenstein
12/17/2015
- Skillings Connolly, Inc. out of Lacey, WA was selected to design and oversee construction of the pump house.
- We are currently working to complete the contract for the agreed upon scope of work.
- Our next step is to have a geo-technical company complete the analysis of soils required for the design. Once we have a design in hand we can provide you with a copy to post the concept design on line.
- We have also linked up the Corps of Engineers with Skillings Connolly earlier in the week and will check to see if Kristen Hafer is in the loop.
|