Update from Steve Ashley
1/19/2016
Project updates are as follows:
- The City of Napavine authorized Gray & Osborne, Inc. to begin work on the project on November 10, 2015.
- A site visit was conducted on December 15, 2015.
- A hydraulic model was developed using the Ecology Western Washington Hydraulic Model.
- A drainage report identifying the basin, projected flows, capacity of the existing system and improvements will be prepared.
- A basemap and preliminary plans of the identified improvements will be prepared.
|