Napavine - Kirkland Road Flooding Project

  << Back

Update from Steve Ashley     3/12/2016

  • Recent work accomplished:
    • Background information was gathered on the drainage basin.
    • Draft Drainage Report and basemap was started.
  • Upcoming work:
    • Additional site survey will be conducted to verify existing conditions.
    • The hydraulic model will be updated based on the survey information.
  • Project is on-track.