Subcommittee Status Updates
3/14/2012  -  CURRENT   

The Project Subcommittee has met in person 6 times, and participated in one conference call since September 9, 2011.  During this time, the Project Subcommittee has developed a matrix of 138 projects that will provide flood relief in the Chehalis River Basin.  This matrix includes flood related projects that were extracted from flood planning documents throughout the Chehalis River Basin.  A total of 15 different documents provided the source material.  These sources...

Subcommittee Action Items
Subcommittee Overview

Purpose/Goals for Subcommittee: 

  • Single Projects subcommittee was conceived to synchronize and understand upper/lower effects.
  • Look at projects that are both structural and not structural.
  • “Projects” can include ‐‐ Dredging, Structures, By‐pass, Levies, Home elevation, Habitat/Ecosystem, Water retention, Barrier removal, “beaver ponds”, emergency management, public works and more.
  • Goal is refined and prioritized master inventory by December 2011.


Legislative Drivers:

Subcommittee Products

 

Date

 

Description Document
3/8/12  DRAFT Proposed Projects Removed

Adobe PDF icon

3/8/12 DRAFT Proposed Project Matrix

Adobe PDF icon

 1/13/12  DRAFT Master Project Compilation Matrix (with assignments) Adobe PDF icon 
11/29/11 DRAFT Proposed Projects Removed Adobe PDF icon
11/29/11 DRAFT Master Project Compilation Matrix

Adobe PDF icon

11/**/2011

 

DRAFT Master Project Compilation List (Ver. 3)

Adobe PDF icon
10/13/2011  DRAFT Master Project Compilation List (Ver. 2)  Adobe PDF icon
09/30/2011  DRAFT Master Project Compilation List (Ver. 1)  Adobe PDF icon

 

Subcommittee Meetings

   Date

Meetings
Links
5/11/12 Projects Subcommittee Mtg #8 Agenda Agenda
3/1/12 Projects Subcommittee Mtg #7 Notes Summary Notes
3/1/12 Projects Subcommittee Mtg #7 Agenda
2/3/12 Projects Subcommittee Mtg #6 Notes  Summary Notes
2/3/12 Projects Subcommittee Mtg #6 Agenda
01/13/12 Projects Subcommittee Mtg #5 Agenda
11/22/2011

Projects Subcommittee Mtg #4

Agenda

10/20/2011

Projects Subcommittee Mtg #3

Agenda

Summary Notes

10/04/2011 Projects Subcommittee Mtg #2

Agenda

Summary Notes

09/09/2011 Projects Subcommittee Mtg #1

Agenda

 

Summary Notes

 

Subcommittee Working Documents

 

Date Description Document
  Critter Adobe PDF icon 
5/11/12 ESB 5127, 2012 Jobs Now Act, Section 313

Adobe PDF icon

3/14/12 Project Matrix Powerpoint presentation for 3/15/12 Workshop

Adobe PDF icon

3/8/12 Memo to Flood Authority for 3/15/12 Workshop on Proposed Project Matrix

Adobe PDF icon

1/16/12 WSE Hydrologic Data Development Recommendation (from Larry Karpack)  Adobe PDF icon
1/16/12
Proposed Additions to Detailed Work Plan (from Larry Karpack) Adobe PDF icon
1/16/12 Email from Greg Hueckel to Project Subcommittee with Assignments Adobe PDF icon
11/29/11 Email from Greg Hueckel to Project Subcommittee with Assignments Adobe PDF icon
10/20/2011 Draft Project List Adobe PDF icon
10/10/2011 Grays Harbor County Draft Hazard Mitigation Plan - Lee Napier Adobe PDF icon
 10/10/2011 City of Chehalis - Bob Nacht Adobe PDF icon
 10/06/2011 ACOE Mitigation Projects in Chehalis Basin Adobe PDF icon
10/**/2011 Description of Potential Enhancement Projects in Upper Chehalis Watershed Adobe PDF icon
09/09/2011 Project Committee Meeting Summary
Adobe PDF icon
08/11/2011 Thurston County Annual Progress Report - Implementing Flood Hazard Mitigation Initiatives in the Natural Hazards Mitigation Plan Adobe PDF icon
05/20/2011 CRBFA Project List Adobe PDF icon
05/12/2011 Projects Memo Adobe PDF icon
04/**/2011 Centralia Comprehensive Flood Management and Natural Hazards Mitigation Plan Annual Progress Report Adobe PDF icon
01/**/2011 City of Aberdeen Public Works Master Project List Adobe PDF icon
06/**/2010 Chehalis River Basin Draft Comprehensive Flood Management Plan Adobe PDF icon
11/22/2009 New Projects Proposed by Flood Authority Jurisdictions Adobe PDF icon
03/13/2009 Confederated Tribes of the Chehalis Reservation CFHMP Adobe PDF icon 
01/**/2009 Lewis County Comprehensive Flood Hazard Management Plan Adobe PDF icon
09/**/2003 Chehalis Basin Partnership - Multi-Purpose Water Storage Assessment Adobe PDF icon
 **/**/2001 Grays Harbor County Draft Hazard Mitigation Plan 2001 Adobe PDF icon
**/**/**** Chehalis Basin Watershed Management Plan Adobe PDF icon

 

Subcommittee Contacts

 Name

Address Telephone Email
Ron Averill

Lewis County

351 NW North St.

Chehalis, WA 98532 

360/740-1283 Ron.Averill@lewiscountywa.gov

Julie Balmelli-Powe

P.O. Box 341

Chehalis, WA  98532

 

 

360/269-4854 (c)

360/748-7270 (w)

 

bll@sipnsearch.com
 Jim Cook

 

City of Aberdeen

200 E. Market St.

Aberdeen, WA 98520 

 

360/537-3224 (msg) jdomingo@aberdeeninfo.com
 Terry Willis

 

Grays Harbor County

100 S. Broadway, Suite 1

Montesano, WA  98563

 

360/249-3731 twillis@co.grays-harbor.wa.us








Staff:      
Greg Hueckel SBGH-Partners, LLC
 
7748 Manzanita DR NW
 
Olympia, WA 98502
360/866-8564 (office)
360/888-5667 (cell)
GregH@sbgh-partners.com




Key Other:


John Donahue WA State Department of Transportation
donahjo@wsdot.wa.gov
Chris Hempleman WA State Department of Ecology
chem461@ecy.wa.gov
Mark Swartout Thurston County
swartom@co.thurston.wa.us
Lara Fowler      
Scott Boettcher      

 

Currently loading

Please Wait...